Largest U.S. Steel Mill: Inside Gary Works - Capacity, History & Impact

Largest U.S. Steel Mill: Inside Gary Works - Capacity, History & Impact

Oct, 8 2025

U.S. Steel Mill Capacity Comparison Tool

Compare Steel Mill Capacities

Select a mill to see its production capacity and key details.

Capacity Comparison Table
Mill Owner Location Annual Crude Steel Capacity (MT) Employees (Full-time)
Gary Works U.S. Steel Gary, Indiana 7.5 million ~4,000
Midlothian Steel Plant Nucor Midlothian, Texas 4.8 million ~3,200
Steel Dynamics Facilities Steel Dynamics Various (Indiana, Ohio, Alabama) 4.2 million ~2,800
ArcelorMittal Indiana ArcelorMittal Gary, Indiana 3.9 million ~2,500

Why Gary Works Leads: Its capacity outpaces the nearest rival by more than 2 million metric tons, and its integrated nature offers a cost advantage that mini-mills can’t match.

When you hear the phrase biggest steel mill in the United States, the name that instantly pops up is GaryWorks - a massive integrated facility owned by U.S.Steel that sits on the banks of the Indiana shoreline.

Quick Takeaways

  • GaryWorks, located in Gary, Indiana, is the largest U.S. steel mill by annual crude steel production.
  • It produces roughly 7‑8million metric tons of crude steel each year, dwarfing the output of any other American mill.
  • Owned by United States Steel Corporation, the mill employs about 4,000 workers on a full‑time basis.
  • Its integrated setup includes coke ovens, blast furnaces, basic oxygen converters, and a full rolling line.
  • Future upgrades aim to cut CO₂ emissions by 30% by 2035, aligning with industry‑wide green‑steel goals.

What Makes Gary Works the Largest?

GaryWorks is an integrated steel mill that combines raw‑material processing, steelmaking, and finishing in a single complex. Its sheer physical footprint exceeds 4million square feet, and the plant runs two blast furnaces, four basic oxygen furnaces, and a full complement of hot‑ and cold‑rolling lines. This vertical integration lets it turn iron ore into finished steel without relying heavily on external suppliers, boosting both capacity and efficiency.

Production Capacity & Output

According to the latest figures published by the American Iron and Steel Institute, GaryWorks churns out an average of 7.5million metric tons of crude steel per year. For comparison, the second‑largest integrated mill, Nucor’s SteelMill in Midlothian, Texas, handles just under 5million tons, while the biggest mini‑mill, SteelDynamics’ facilities combined, reach about 4million tons.

The mill’s product slate includes hot‑rolled coil, cold‑rolled sheet, plate, and structural shapes. Roughly 55% of its output goes to the automotive sector, 30% feeds construction and infrastructure projects, and the rest serves appliances, machinery, and export markets.

Interior shot of blast furnaces, converters, and rollers at Gary Works with glowing molten metal and workers.

Historical Growth and Milestones

Founded in 1906 as a Carnegie‑owned venture, GaryWorks quickly grew to become a cornerstone of the Midwestern steel boom. Key milestones include:

  1. 1918 - Addition of the first blast furnace, increasing capacity to 1million tons.
  2. 1955 - Completion of a second blast furnace, making it the nation’s first dual‑furnace plant.
  3. 1972 - Installation of a continuous casting line, cutting slab‑to‑coil time by 40%.
  4. 1999 - Modernization of basic oxygen converters, boosting efficiency by 15%.
  5. 2022 - Launch of a low‑carbon pilot that captures 10% of furnace off‑gas CO₂.

Each upgrade has pushed the mill’s capacity higher while preserving its status as the nation’s steel powerhouse.

Economic Impact & Employment

GaryWorks is a major employer in Northwest Indiana. The plant directly supports roughly 4,000 full‑time jobs, and an additional 12,000 indirect jobs stem from suppliers, logistics, and local services. The mill contributes about $2.3billion annually in wages and taxes, making it a critical driver of the regional economy.

Beyond jobs, the mill fuels downstream industries. For example, the nearby Port of Indiana‑Leviathan handles over 8million tons of steel‑related cargo each year, largely sourced from GaryWorks. The plant’s stable output also underpins national infrastructure programs, from highway steel to bridge components.

How It Stacks Up Against Other Major U.S. Mills

Comparison of the Top Four U.S. Steel Mills (2024‑2025)
Mill Owner Location Annual Crude Steel Capacity (MT) Employees (Full‑time)
Gary Works U.S. Steel Gary, Indiana 7.5million ~4,000
Midlothian Steel Plant Nucor Midlothian, Texas 4.8million ~3,200
Steel Dynamics Facilities Steel Dynamics Various (Indiana, Ohio, Alabama) 4.2million ~2,800
ArcelorMittal Indiana ArcelorMittal Gary, Indiana 3.9million ~2,500

The table makes it clear why GaryWorks holds the top spot: its capacity outpaces the nearest rival by more than 2million metric tons, and its integrated nature offers a cost advantage that mini‑mills can’t match.

Illustration of Gary Works adding hydrogen reduction and carbon capture, highlighting green steel transition.

Future Outlook - Sustainability and Expansion

U.S.Steel has announced a multi‑phase investment plan targeting a 30% reduction in carbon intensity by 2035. Key components include:

  • Installation of a hydrogen‑based direct reduction unit to replace a portion of coke‑fueled blast furnace output.
  • Expansion of the plant’s electric arc furnace (EAF) capacity to handle up to 1million tons of scrap‑derived steel annually.
  • Partnering with the Indiana Department of Energy on a carbon‑capture pilot expected to sequester 500,000 tons of CO₂ per year.

These initiatives aim to keep GaryWorks competitive amid tightening environmental regulations and a growing demand for “green steel” in sectors like automotive and construction.

Key Takeaway for Industry Professionals

If you’re tracking capacity trends, supply chain risks, or investment opportunities in North American steel, GaryWorks serves as the benchmark. Its production numbers shape market pricing, its workforce trends signal regional economic health, and its sustainability roadmap sets the pace for the next generation of U.S. steel manufacturing.

Frequently Asked Questions

What is the annual crude steel production of GaryWorks?

GaryWorks typically produces between 7 and 8million metric tons of crude steel each year, making it the largest single‑site producer in the United States.

Who owns GaryWorks?

The mill is owned by United States Steel Corporation, commonly referred to as U.S.Steel.

How many people work at GaryWorks?

Approximately 4,000 full‑time employees are on the payroll, with thousands more in indirect jobs linked to the plant’s supply chain.

What makes an integrated steel mill different from a mini‑mill?

An integrated mill processes raw iron ore into steel using blast furnaces and basic oxygen furnaces, handling the entire production chain on a single site. Mini‑mills, by contrast, melt scrap steel in electric arc furnaces and rely on external suppliers for raw inputs.

Is GaryWorks moving toward greener steel production?

Yes. U.S.Steel plans to add hydrogen‑based direct reduction, expand electric arc furnace capacity, and implement carbon‑capture technology, aiming for a 30% cut in CO₂ emissions by 2035.